S/O Wagtail Lane, Craghead, Stanley, County Durham, DH9 7HH
Wagtail Lane, Craghead - Solar Panels is a 27 MW solar farm project in North East. The applicant or operator on record is Ampyr Energy UK Development Limited. The planning application was refused. The determining authority is County Durham, reference DM/24/03466/FPA.β¦
Refused
Project stageRefused
PlanningJan 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-13.
Registered planning capacity; not measured generation.
Wagtail Lane, Craghead - Solar Panels is a 27 MW solar farm project in North East. The applicant or operator on record is Ampyr Energy UK Development Limited. The planning application was refused. The determining authority is County Durham, reference DM/24/03466/FPA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
27.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ampyr Energy UK Development Limited
Owner / operator
Ampyr Energy UK Development Limited
Location
S/O Wagtail Lane, Craghead, Stanley, County Durham, DH9 7HH