Volkswagen Group UK, Garamonde Drive - Solar Panels is a 0.7 MW solar farm project in South East. The applicant or operator on record is Volkswagen Group UK Limited. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority…

Consented / Approved
Project stageConsented
  1. PlanningSep 2024 (completed)
  2. ConsentedJan 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.700 MW
Registered Capacity

πŸ“‹ Project Overview

Volkswagen Group UK, Garamonde Drive - Solar Panels is a 0.7 MW solar farm project in South East. The applicant or operator on record is Volkswagen Group UK Limited. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Milton Keynes, reference 24/01527/PRIOR.

Site Schematic

SUBSTATION ? ha Β· 0.7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperVolkswagen Group UK Limited
Owner / operatorVolkswagen Group UK Limited
Year consented2025
LocationVolkswagen Group Uk Ltd Garamonde Drive Wymbush, Buckinghamshire, MK8 8DF
RegionSouth East
Coordinates52.0423234Β°N, 0.7958263Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof