Viking Link Limited, North Ing Drove, Spalding, Lincolnshire, PE11 4XY
Viking Link, North Ing Drove - Solar Panels is a 0.18 MW solar farm project in East Midlands. The applicant or operator on record is Viking Link Limited. The scheme is currently in the planning system, submitted July 2023. The determining authority is South Holland, reference H04β¦
In Planning
Project stageIn planning
PlanningJul 2023 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2023-08-07.
Registered planning capacity; not measured generation.
Viking Link, North Ing Drove - Solar Panels is a 0.18 MW solar farm project in East Midlands. The applicant or operator on record is Viking Link Limited. The scheme is currently in the planning system, submitted July 2023. The determining authority is South Holland, reference H04-0656-23.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.180 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Viking Link Limited
Owner / operator
Viking Link Limited
Location