Opp Caravan Site, Gipsy Lane, Irchester, Wellingborough, Northamptonshire, NN29 7PY
Vicarage Farm - Battery Energy Storage System is a 50 MW battery storage project in East Midlands. The applicant or operator on record is Enray Power Limited. The planning application was refused. The determining authority is North Northamptonshire, reference NW/25/00405/FUL.β¦
Refused
Project stageRefused
PlanningJul 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-06.
Registered planning capacity; not measured generation.
Vicarage Farm - Battery Energy Storage System is a 50 MW battery storage project in East Midlands. The applicant or operator on record is Enray Power Limited. The planning application was refused. The determining authority is North Northamptonshire, reference NW/25/00405/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
50.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Enray Power Limited
Owner / operator
Enray Power Limited
Location
Opp Caravan Site, Gipsy Lane, Irchester, Wellingborough, Northamptonshire, NN29 7PY