Land at Vicarage Drove, Bicker, Boston, Lincolnshire, PE20 3BF
Vicarage Drove - Solar farm & Battery storage is a 20.5 MW battery storage project in East Midlands. The applicant or operator on record is Renewable Connections Developments Limited. Planning permission has been granted as of January 2024 and it is awaiting construction. The detβ¦
Consented / Approved
Project stageConsented
PlanningOct 2021 (completed)
ConsentedJan 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-03-11.
Registered planning capacity; not measured generation.
Vicarage Drove - Solar farm & Battery storage is a 20.5 MW battery storage project in East Midlands. The applicant or operator on record is Renewable Connections Developments Limited. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Boston, reference B/21/0443.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.500 MW
Battery chemistry
Co-located with RE
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Renewable Connections Developments Limited
Owner / operator
Renewable Connections Developments Limited
Year consented
2024
Location
Land at Vicarage Drove, Bicker, Boston, Lincolnshire, PE20 3BF