Verge At Succombs Hill, By Wapses Lodge Roundabout, Caterham, Surrey, CR3 0BL
Verge At Succombs Hill, By Wapses Lodge Roundabout - Battery Storage is a 0.2 MW battery storage project in South East. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of November 2024 and it is awaiting construction. The determiniβ¦
Consented / Approved
Project stageConsented
PlanningSep 2024 (completed)
ConsentedNov 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-01-13.
Registered planning capacity; not measured generation.
Verge At Succombs Hill, By Wapses Lodge Roundabout - Battery Storage is a 0.2 MW battery storage project in South East. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Tandridge, reference 2024/849.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Year consented
2024
Location
Verge At Succombs Hill, By Wapses Lodge Roundabout, Caterham, Surrey, CR3 0BL