π Project Overview
UTS Engineering, Pilgrimsway - Solar Panels is a solar farm project in North East. The applicant or operator on record is Utility Technology Services Limited. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is South Tyneside, reference 250581.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Utility Technology Services Limited |
| Owner / operator | Utility Technology Services Limited |
| Year consented | 2025 |
| Location | UTS Engineering Ltd Connor House, Pilgrims Way, Bede Industrial Estate, Tyne And Wear, NE32 3HG |
| Region | North East |
| Coordinates | 54.976886Β°N, 1.4613087Β°W |