πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

UTS Engineering, Pilgrimsway - Solar Panels

UTS Engineering Ltd Connor House, Pilgrims Way, Bede Industrial Estate, Tyne And Wear, NE32 3HG

UTS Engineering, Pilgrimsway - Solar Panels is a solar farm project in North East. The applicant or operator on record is Utility Technology Services Limited. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is Sou…

Consented / Approved
Project stageConsented
  1. PlanningSep 2025 (completed)
  2. ConsentedOct 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-01-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

UTS Engineering, Pilgrimsway - Solar Panels is a solar farm project in North East. The applicant or operator on record is Utility Technology Services Limited. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is South Tyneside, reference 250581.

Site Schematic

SUBSTATION ? ha Β· MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUtility Technology Services Limited
Owner / operatorUtility Technology Services Limited
Year consented2025
LocationUTS Engineering Ltd Connor House, Pilgrims Way, Bede Industrial Estate, Tyne And Wear, NE32 3HG
RegionNorth East
Coordinates54.976886Β°N, 1.4613087Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-09-10
2025-10-22