π Project Overview
Uppingham Road - Micro Energy Storage System is a 0.2 MW battery storage project in East Midlands. The applicant or operator on record is AMP Clean Energy. The scheme is currently in the planning system, submitted November 2025. The determining authority is North Northamptonshire, reference 25/01771/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Location | Uppingham Road, Corby, Northamptonshire, NN18 9EZ |
| Region | East Midlands |
| Coordinates | 52.4612635Β°N, 0.7367854Β°W |