Onshore Wind

Upper Mains Farm - Wind Turbine

S/O Upper Mains Farm, Turriff, Aberdeenshire, AB53 4EL

Upper Mains Farm - Wind Turbine is a 0.45 MW onshore wind project in Scotland. The applicant or operator on record is CWE V27 Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Aberdeenshire, reference APP/2023/1968.…

In Planning
Project stageIn planning
  1. PlanningNov 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2023-11-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.450 MW
Registered Capacity

πŸ“‹ Project Overview

Upper Mains Farm - Wind Turbine is a 0.45 MW onshore wind project in Scotland. The applicant or operator on record is CWE V27 Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Aberdeenshire, reference APP/2023/1968.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.450 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCWE V27 Limited
Owner / operatorCWE V27 Limited
LocationS/O Upper Mains Farm, Turriff, Aberdeenshire, AB53 4EL
RegionScotland
Coordinates57.5249328Β°N, 2.4901554Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.45
No. of Turbines1
Height of Turbines (m)77

πŸ“… Project Timeline

2023-11-01