πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Unit G1, Whistler Drive - Solar Panels

Unit G1 Whistler Drive Castleford, West Yorkshire, WF10 5HX

Unit G1, Whistler Drive - Solar Panels is a 0.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Really Useful Products Limited. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authori…

Consented / Approved
Project stageConsented
  1. PlanningMay 2022 (completed)
  2. ConsentedSep 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2022-06-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Unit G1, Whistler Drive - Solar Panels is a 0.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Really Useful Products Limited. Planning permission has been granted as of September 2022 and it is awaiting construction. The determining authority is Wakefield, reference 22/01192/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperReally Useful Products Limited
Owner / operatorReally Useful Products Limited
Year consented2022
LocationUnit G1 Whistler Drive Castleford, West Yorkshire, WF10 5HX
RegionYorkshire and Humber
Coordinates53.706245Β°N, 1.3467297Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)19000

πŸ“… Project Timeline

2022-05-30
2022-09-09