Unit 15, Borrowmeadow Road

Unit 15, Land adj and Rear Of Units @, Borrowmeadow Road, Stirling, Central, Stirling, FK7 7FB

Unit 15, Borrowmeadow Road is a 19 MW battery storage project in Scotland. The applicant or operator on record is Flexible Grid Power. The application has been withdrawn or the scheme abandoned. The determining authority is Stirling, reference 17/00665/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-11-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

19.000 MW
Power Capacity

πŸ“‹ Project Overview

Unit 15, Borrowmeadow Road is a 19 MW battery storage project in Scotland. The applicant or operator on record is Flexible Grid Power. The application has been withdrawn or the scheme abandoned. The determining authority is Stirling, reference 17/00665/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)19.000 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFlexible Grid Power
Owner / operatorFlexible Grid Power
LocationUnit 15, Land adj and Rear Of Units @, Borrowmeadow Road, Stirling, Central, Stirling, FK7 7FB
RegionScotland
Coordinates56.1175004Β°N, 3.9140609Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2017-08-22