Unit 15, Land adj and Rear Of Units @, Borrowmeadow Road, Stirling, Central, Stirling, FK7 7FB
Unit 15, Borrowmeadow Road is a 19 MW battery storage project in Scotland. The applicant or operator on record is Flexible Grid Power. The application has been withdrawn or the scheme abandoned. The determining authority is Stirling, reference 17/00665/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2017 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2019-11-27.
Registered planning capacity; not measured generation.
Unit 15, Borrowmeadow Road is a 19 MW battery storage project in Scotland. The applicant or operator on record is Flexible Grid Power. The application has been withdrawn or the scheme abandoned. The determining authority is Stirling, reference 17/00665/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
19.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Flexible Grid Power
Owner / operator