Uckfield Solar Electric Forecourt

Land At Copwood Barn, Rocks Road, Uckfield, East Sussex, East Sussex, TN22 3PT

Uckfield Solar Electric Forecourt is a 5.5 MW solar farm project in South East. The applicant or operator on record is Gridserve Sustainable Energy. Planning permission has been granted as of March 2021 and it is awaiting construction. The determining authority is Wealden, refere…

Consented / Approved
Project stageConsented
  1. PlanningAug 2020 (completed)
  2. ConsentedMar 2021 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2021-04-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.500 MW
Registered Capacity

πŸ“‹ Project Overview

Uckfield Solar Electric Forecourt is a 5.5 MW solar farm project in South East. The applicant or operator on record is Gridserve Sustainable Energy. Planning permission has been granted as of March 2021 and it is awaiting construction. The determining authority is Wealden, reference WD/2020/1244/MAJ.

Site Schematic

SUBSTATION ? ha Β· 5.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGridserve Sustainable Energy
Owner / operatorGridserve Sustainable Energy
Year consented2021
LocationLand At Copwood Barn, Rocks Road, Uckfield, East Sussex, East Sussex, TN22 3PT
RegionSouth East
Coordinates50.9689436Β°N, 0.0793126Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)94000

πŸ“… Project Timeline

2020-08-03
2021-03-16