Tynemouth Energy Storage System (TESS) is a 25 MW battery storage project in North East. The applicant or operator on record is Enel (formerly Element Power). It is recorded as operational since May 2018. The determining authority is North Tyneside, reference 16/01451/FUL.β¦
OperationalΒ· Since 2018
Project stageOperating
PlanningSep 2016 (completed)
Consented (completed)
ConstructionDec 2018 (completed)
OperatingMay 2018 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2018-08-03.
Registered planning capacity; not measured generation.
Tynemouth Energy Storage System (TESS) is a 25 MW battery storage project in North East. The applicant or operator on record is Enel (formerly Element Power). It is recorded as operational since May 2018. The determining authority is North Tyneside, reference 16/01451/FUL.