Tyn Y Pant Farm, Caehopkin, Abercrave, Swansea, Powys, SA9 1UE
Tyn y Pant is a 1.6 MW solar farm project in Wales. The applicant or operator on record is Solar Power Parks. The planning application was refused. The determining authority is Powys, reference P/2015/1013.β¦
Refused
Project stageRefused
PlanningDec 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2016-11-01.
Registered planning capacity; not measured generation.
Tyn y Pant is a 1.6 MW solar farm project in Wales. The applicant or operator on record is Solar Power Parks. The planning application was refused. The determining authority is Powys, reference P/2015/1013.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Solar Power Parks
Owner / operator
Solar Power Parks
Location
Tyn Y Pant Farm, Caehopkin, Abercrave, Swansea, Powys, SA9 1UE