Tydd Solar Farm is a 24.95 MW solar farm project in Eastern. The applicant or operator on record is Pathfinder Clean Energy UK Dev Limited. The planning application was refused. The determining authority is Powys, reference H19-0329-24.β¦
Refused
Project stageRefused
PlanningApr 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-06-02.
Registered planning capacity; not measured generation.
Tydd Solar Farm is a 24.95 MW solar farm project in Eastern. The applicant or operator on record is Pathfinder Clean Energy UK Dev Limited. The planning application was refused. The determining authority is Powys, reference H19-0329-24.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.