Bioenergy / Waste

Twinwoods Energy Recovery Facility - Resubmission

Twinwoods Business Park, Thurleigh Road, Milton Ernest,, Bedfordshire

Twinwoods Energy Recovery Facility - Resubmission is a 11.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Biogen Power. The planning application was refused. The determining authority is Bedford, reference 10/02851/FULWME.…

Refused
Project stageRefused
  1. PlanningNov 2010 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-08-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

11.200 MW
Registered Capacity

πŸ“‹ Project Overview

Twinwoods Energy Recovery Facility - Resubmission is a 11.2 MW bioenergy / waste project in Eastern. The applicant or operator on record is Biogen Power. The planning application was refused. The determining authority is Bedford, reference 10/02851/FULWME.

πŸ”§ Technical Specifications

Capacity (MW)11.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen Power
Owner / operatorBiogen Power
LocationTwinwoods Business Park, Thurleigh Road, Milton Ernest,, Bedfordshire
RegionEastern
Coordinates52.1939332Β°N, 0.4875971Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2010-11-17