πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Twinwoods CHP

Twinwoods Business Park, Thurleigh Road, Milton Ernest, Bedford,, Bedfordshire, MK41 6AE

Twinwoods CHP is a 11 MW bioenergy / waste project in Eastern. The applicant or operator on record is Biogen Power. The planning application was refused. The determining authority is Bedford, reference 09/01258/FULWME.…

Refused
Project stageRefused
  1. PlanningJun 2009 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2014-08-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

11.000 MW
Registered Capacity

πŸ“‹ Project Overview

Twinwoods CHP is a 11 MW bioenergy / waste project in Eastern. The applicant or operator on record is Biogen Power. The planning application was refused. The determining authority is Bedford, reference 09/01258/FULWME.

πŸ”§ Technical Specifications

Capacity (MW)11.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen Power
Owner / operatorBiogen Power
LocationTwinwoods Business Park, Thurleigh Road, Milton Ernest, Bedford,, Bedfordshire, MK41 6AE
RegionEastern
Coordinates52.1926201Β°N, 0.4910798Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2009-06-10