πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Offshore Wind

TwinHub (previously called Wave Hub Floating Wind)

Wave Hub 16km North Of, St Ives Head, Hayle, Offshore, TR27 4DD

TwinHub (previously called Wave Hub Floating Wind) is a 32 MW offshore wind project in Offshore. The applicant or operator on record is Hexicon. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is The Planning Insp…

Consented / Approved
Project stageConsented
  1. PlanningOct 2018 (completed)
  2. ConsentedJan 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2021-12-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

32.000 MW
Registered Capacity

πŸ“‹ Project Overview

TwinHub (previously called Wave Hub Floating Wind) is a 32 MW offshore wind project in Offshore. The applicant or operator on record is Hexicon. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is The Planning Inspectorate - National Infrastructure, reference PA18/10363.

Site Schematic

β—„ SHORE (~? km) NORTH SEA / OFFSHORE Turbine () Export cable

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)32.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHexicon
Owner / operatorHexicon
Year consented2022
LocationWave Hub 16km North Of, St Ives Head, Hayle, Offshore, TR27 4DD
RegionOffshore
Coordinates50.1930185Β°N, 5.4305152Β°W

Additional published register fields

Registered technologyWind Offshore
CfD Allocation RoundAR4
CfD Capacity (MW)32
No. of Turbines4
Height of Turbines (m)220

πŸ“… Project Timeline

2018-10-31
2022-01-12