Bioenergy / Waste

Twemlow Lane AD Plant (Waste AD)

Former Fuel Storage Depot, Twemlow Lane, Twemlow, Crewe,, Cheshire

Twemlow Lane AD Plant (Waste AD) is a 1.2 MW bioenergy / waste project in North West. The applicant or operator on record is C.R.E.S Biogas. The planning application was refused. The determining authority is Cheshire East, reference 12/0705W.…

Refused
Project stageRefused
  1. PlanningFeb 2012 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-09-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Twemlow Lane AD Plant (Waste AD) is a 1.2 MW bioenergy / waste project in North West. The applicant or operator on record is C.R.E.S Biogas. The planning application was refused. The determining authority is Cheshire East, reference 12/0705W.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperC.R.E.S Biogas
Owner / operatorC.R.E.S Biogas
LocationFormer Fuel Storage Depot, Twemlow Lane, Twemlow, Crewe,, Cheshire
RegionNorth West
Coordinates53.2175878Β°N, 2.3300417Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2012-02-14