Tullynaskeagh Solar Farm is a 5.1 MW solar farm project in Northern Ireland. The applicant or operator on record is BNRG Northern Power. The application has been withdrawn or the scheme abandoned. The determining authority is Newry, Mourne and Down, reference R/2013/0361/F.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-09-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.100 MW
Registered Capacity

πŸ“‹ Project Overview

Tullynaskeagh Solar Farm is a 5.1 MW solar farm project in Northern Ireland. The applicant or operator on record is BNRG Northern Power. The application has been withdrawn or the scheme abandoned. The determining authority is Newry, Mourne and Down, reference R/2013/0361/F.

Site Schematic

SUBSTATION ? ha Β· 5.1 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBNRG Northern Power
Owner / operatorBNRG Northern Power
Year consented2014
LocationLand immediately north of No. 22 Tullynaskeagh Road, Downpatrick, Co. Down, BT30 7EU
RegionNorthern Ireland
Coordinates54.3057034Β°N, 5.6189755Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2013-08-15
2014-01-17