Solar Farm

Tudworth Field Road, Hatfield - Solar Panels

Tudworth Hall Farm Tudworth Field Road Hatfield, South Yorkshire, DN7 6HQ

Tudworth Field Road, Hatfield - Solar Panels is a 0.18 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is SJS Agriplant Limited. It is recorded as under construction since April 2022. The determining authority is Doncaster, reference 22/00698/FU…

Under Construction
Project stageUnder construction
  1. PlanningMar 2022 (completed)
  2. ConsentedJul 2022 (completed)
  3. ConstructionApr 2022 (current stage)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Under Construction.

Official register: July 2026

Recorded status: Under Construction. Source record updated 2022-04-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.180 MW
Registered Capacity

πŸ“‹ Project Overview

Tudworth Field Road, Hatfield - Solar Panels is a 0.18 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is SJS Agriplant Limited. It is recorded as under construction since April 2022. The determining authority is Doncaster, reference 22/00698/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.180 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSJS Agriplant Limited
Owner / operatorSJS Agriplant Limited
Year consented2022
Construction started2022
LocationTudworth Hall Farm Tudworth Field Road Hatfield, South Yorkshire, DN7 6HQ
RegionYorkshire and Humber
Coordinates53.5871113Β°N, 0.9642862Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)1000

πŸ“… Project Timeline

2022-03-30
2022-07-06
2022-04-01