πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Trumps Farm

Long Cross, Chertsey, Surrey. KT16 0EF, Surrey

Trumps Farm is a 14 MW bioenergy / waste project in South East. The applicant or operator on record is Surrey Waste Management. The application has been withdrawn or the scheme abandoned. The determining authority is Runnymede, reference RU.08/0556.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2011-06-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.000 MW
Registered Capacity

πŸ“‹ Project Overview

Trumps Farm is a 14 MW bioenergy / waste project in South East. The applicant or operator on record is Surrey Waste Management. The application has been withdrawn or the scheme abandoned. The determining authority is Runnymede, reference RU.08/0556.

πŸ”§ Technical Specifications

Capacity (MW)14.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSurrey Waste Management
Owner / operatorSurrey Waste Management
LocationLong Cross, Chertsey, Surrey. KT16 0EF, Surrey
RegionSouth East
Coordinates51.3803586Β°N, 0.5691683Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

2008-06-09