Troywood Wind Turbine is a 2.3 MW onshore wind project in Scotland. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 09/02880/FULL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2013-10-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.300 MW
Registered Capacity

πŸ“‹ Project Overview

Troywood Wind Turbine is a 2.3 MW onshore wind project in Scotland. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 09/02880/FULL.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrivate Developer
Owner / operatorPrivate Developer
LocationTroywood St Andrews Fife KY16 8QH, Fife
RegionScotland
Coordinates56.2736447Β°N, 2.7126638Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines1