Trentworthy Solar Farm is a 5 MW solar farm project in South West. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/1132/2010/FULM.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2011 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-08-24.
Registered planning capacity; not measured generation.
Trentworthy Solar Farm is a 5 MW solar farm project in South West. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/1132/2010/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.