πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Trecwn Biomass Plant

former Royal Naval Armament Depot in Trecwn, Dyfed

Trecwn Biomass Plant is a 25 MW bioenergy / waste project in Wales. The applicant or operator on record is Renewable Developments Wales. The application has been withdrawn or the scheme abandoned. The determining authority is Pembrokeshire, reference 14/0300/PA.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2022-10-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

25.000 MW
Registered Capacity

πŸ“‹ Project Overview

Trecwn Biomass Plant is a 25 MW bioenergy / waste project in Wales. The applicant or operator on record is Renewable Developments Wales. The application has been withdrawn or the scheme abandoned. The determining authority is Pembrokeshire, reference 14/0300/PA.

πŸ”§ Technical Specifications

Capacity (MW)25.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Developments Wales
Owner / operatorRenewable Developments Wales
Year consented2015
Locationformer Royal Naval Armament Depot in Trecwn, Dyfed
RegionWales
Coordinates51.9501177Β°N, 4.9408771Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2014-07-01
2015-04-14