πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Treading Wind Farm - Fenland

Between Gorefield, Cambs and Sutton St Edmund, Lincs, Cambridgeshire

Treading Wind Farm - Fenland is a 15 MW onshore wind project in Eastern. The applicant or operator on record is Wind Ventures. The planning application was refused. The determining authority is Fenland, reference F/YR11/0113/F.…

Refused
Project stageRefused
  1. PlanningJan 2011 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2013-10-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

15.000 MW
Registered Capacity

πŸ“‹ Project Overview

Treading Wind Farm - Fenland is a 15 MW onshore wind project in Eastern. The applicant or operator on record is Wind Ventures. The planning application was refused. The determining authority is Fenland, reference F/YR11/0113/F.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)15.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWind Ventures
Owner / operatorWind Ventures
LocationBetween Gorefield, Cambs and Sutton St Edmund, Lincs, Cambridgeshire
RegionEastern
Coordinates52.6946937Β°N, 0.0482369Β°E

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.5
No. of Turbines6

πŸ“… Project Timeline

2011-01-21