Between Gorefield, Cambs and Sutton St Edmund, Lincs, Cambridgeshire
Treading Wind Farm - Fenland is a 15 MW onshore wind project in Eastern. The applicant or operator on record is Wind Ventures. The planning application was refused. The determining authority is Fenland, reference F/YR11/0113/F.β¦
Refused
Project stageRefused
PlanningJan 2011 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2013-10-25.
Registered planning capacity; not measured generation.
Treading Wind Farm - Fenland is a 15 MW onshore wind project in Eastern. The applicant or operator on record is Wind Ventures. The planning application was refused. The determining authority is Fenland, reference F/YR11/0113/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
15.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Wind Ventures
Owner / operator
Wind Ventures
Location
Between Gorefield, Cambs and Sutton St Edmund, Lincs, Cambridgeshire