Solar Farm

Treading Bank Solar Farm

Sw/O Treading Bank, Tydd St Giles, Wisbech, Cambridgeshire, PE13 5LE

Treading Bank Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Renewable Connections. The planning application was refused. The determining authority is Fenland, reference F/YR25/0758/F.…

Refused
Project stageRefused
  1. PlanningOct 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-12-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Treading Bank Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Renewable Connections. The planning application was refused. The determining authority is Fenland, reference F/YR25/0758/F.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Connections
Owner / operatorRenewable Connections
LocationSw/O Treading Bank, Tydd St Giles, Wisbech, Cambridgeshire, PE13 5LE
RegionEastern
Coordinates52.7277693Β°N, 0.1114409Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)964900

πŸ“… Project Timeline

2025-10-13