π Project Overview
Toyota Limited, Yew Tree Bottom Road - Solar Panels is a 0.25 MW solar farm project in South East. The applicant or operator on record is Toyota GB PLC. Planning permission has been granted as of May 2026 and it is awaiting construction. The determining authority is Reigate and Banstead, reference 26/00327/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.250 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Toyota GB PLC |
| Owner / operator | Toyota GB PLC |
| Year consented | 2026 |
| Location | Toyota (UK) Ltd Yew Tree Bottom Road Epsom Downs, Surrey, KT18 5UZ |
| Region | South East |
| Coordinates | 51.3155916Β°N, 0.2323338Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |
| Are they re-applying (Old REPD Ref) | 20467 |