Toyota (UK) Ltd Yew Tree Bottom Road Epsom Downs, Surrey, KT18 5UZ
Toyota Limited, Yew Tree Bottom Road - Solar Panels is a 0.25 MW solar farm project in South East. The applicant or operator on record is Toyota GB PLC. The scheme is currently in the planning system, submitted February 2026. The determining authority is Reigate and Banstead, refβ¦
Revised
Project stageSuperseded by a new application
PlanningFeb 2026 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2026-03-09.
Registered planning capacity; not measured generation.
Toyota Limited, Yew Tree Bottom Road - Solar Panels is a 0.25 MW solar farm project in South East. The applicant or operator on record is Toyota GB PLC. The scheme is currently in the planning system, submitted February 2026. The determining authority is Reigate and Banstead, reference 26/00213/PAP14J.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.250 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Toyota GB PLC
Owner / operator
Toyota GB PLC
Location
Toyota (UK) Ltd Yew Tree Bottom Road Epsom Downs, Surrey, KT18 5UZ