π Project Overview
Toronto Way, New Rossington Solar Panels is a 2.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Sonne Solar Limited. Planning permission has been granted as of April 2021 and it is awaiting construction. The determining authority is Doncaster, reference 21/00377/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 2 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Sonne Solar Limited |
| Owner / operator | Sonne Solar Limited |
| Year consented | 2021 |
| Location | Unit 1 Toronto Way New Rossington Doncaster, South Yorkshire, DN11 0GU |
| Region | Yorkshire and Humber |
| Coordinates | 53.474327Β°N, 1.1102423Β°W |