Unit 1 Toronto Way New Rossington Doncaster, South Yorkshire, DN11 0GU
Toronto Way, New Rossington Solar Panels is a 2.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Sonne Solar Limited. Planning permission has been granted as of April 2021 and it is awaiting construction. The determining authority is Doncastβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2021 (completed)
ConsentedApr 2021 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-02-03.
Registered planning capacity; not measured generation.
Toronto Way, New Rossington Solar Panels is a 2.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Sonne Solar Limited. Planning permission has been granted as of April 2021 and it is awaiting construction. The determining authority is Doncaster, reference 21/00377/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Sonne Solar Limited
Owner / operator
Sonne Solar Limited
Year consented
2021
Location
Unit 1 Toronto Way New Rossington Doncaster, South Yorkshire, DN11 0GU