Solar Farm

Tithe Barn Lane

Land Bounded By Black Brook, Chapel Lane And Tithe Barn Lane Heapey, Lancashire

Tithe Barn Lane is a 8 MW solar farm project in North West. The applicant or operator on record is Cassidy & Ashton Group. The planning application was refused. The determining authority is Chorley, reference 13/00811/FULMAJ.…

Refused
Project stageRefused
  1. PlanningAug 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-01-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity

πŸ“‹ Project Overview

Tithe Barn Lane is a 8 MW solar farm project in North West. The applicant or operator on record is Cassidy & Ashton Group. The planning application was refused. The determining authority is Chorley, reference 13/00811/FULMAJ.

Site Schematic

SUBSTATION ? ha Β· 8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCassidy & Ashton Group
Owner / operatorCassidy & Ashton Group
LocationLand Bounded By Black Brook, Chapel Lane And Tithe Barn Lane Heapey, Lancashire
RegionNorth West
Coordinates53.6746555Β°N, 2.6003754Β°W

Additional published register fields

Registered technologySolar Photovoltaics

πŸ“… Project Timeline

2013-08-29