Tillbridge Solar Farm, Hemswell, Lincolnshire, DN21 5UN
Tillbridge Solar Farm, Hemswell - Solar Panels is a 500 MW solar farm project in East Midlands. The applicant or operator on record is Tillbridge Solar Limited. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is Tβ¦
Consented / Approved
Project stageConsented
PlanningApr 2024 (completed)
ConsentedOct 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-10-14.
Registered planning capacity; not measured generation.
Tillbridge Solar Farm, Hemswell - Solar Panels is a 500 MW solar farm project in East Midlands. The applicant or operator on record is Tillbridge Solar Limited. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is The Planning Inspectorate - National Infrastructure, reference EN010142.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
500.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Tillbridge Solar Limited
Owner / operator
Tillbridge Solar Limited
Year consented
2025
Location
Tillbridge Solar Farm, Hemswell, Lincolnshire, DN21 5UN