The Barn south east of 8 Tiddlywink, South From Yatton Keynell To Crossroads, Yatton Keynell, Chippenham, Wiltshire, SN14 7BY
Tiddlywink Barn Battery Storage Power Plant is a 20 MW battery storage project in South West. The applicant or operator on record is Mcballester Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Wiltshire, reference PL/2021/07610.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2021 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2022-06-14.
Registered planning capacity; not measured generation.
Tiddlywink Barn Battery Storage Power Plant is a 20 MW battery storage project in South West. The applicant or operator on record is Mcballester Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Wiltshire, reference PL/2021/07610.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Mcballester Limited
Owner / operator
Mcballester Limited
Location
The Barn south east of 8 Tiddlywink, South From Yatton Keynell To Crossroads, Yatton Keynell, Chippenham, Wiltshire, SN14 7BY