Water Tower Christmas Hil, Three Maids Hill, South Wonston, Winchester,, Hampshire, SO21 2QU
Three Maids Hill Solar Farm is a battery storage project in South East. The applicant or operator on record is Environmental Asset Management. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 20/02311/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2020 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedMay 2021 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2024-07-29.
Registered planning capacity; not measured generation.
Three Maids Hill Solar Farm is a battery storage project in South East. The applicant or operator on record is Environmental Asset Management. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 20/02311/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Battery chemistry
Co-located with RE
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Environmental Asset Management
Owner / operator
Environmental Asset Management
Year consented
2021
Location
Water Tower Christmas Hil, Three Maids Hill, South Wonston, Winchester,, Hampshire, SO21 2QU