Solar Farm

Thomas Armstrong - Solar Panels

Sellite Blocks Limited, Long Lane, Walton, Goole, Yorkshire, DN14 0BT

Thomas Armstrong - Solar Panels is a 0.18 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Thomas Armstrong (Construction) Limited. Planning permission has been granted as of July 2023 and it is awaiting construction. The determining authority…

Consented / Approved
Project stageConsented
  1. PlanningMay 2023 (completed)
  2. ConsentedJul 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-07-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.180 MW
Registered Capacity

πŸ“‹ Project Overview

Thomas Armstrong - Solar Panels is a 0.18 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Thomas Armstrong (Construction) Limited. Planning permission has been granted as of July 2023 and it is awaiting construction. The determining authority is North Yorkshire, reference ZG2023/0526/PAS.

Site Schematic

SUBSTATION ? ha Β· 0.18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.180 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperThomas Armstrong (Construction) Limited
Owner / operatorThomas Armstrong (Construction) Limited
Year consented2023
LocationSellite Blocks Limited, Long Lane, Walton, Goole, Yorkshire, DN14 0BT
RegionYorkshire and Humber
Coordinates53.6859808Β°N, 1.1016994Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2023-05-16
2023-07-10