Solar Farm

The Windrush Millenium Centre, Alexandra Road - Solar Panels

Ground Floor, The Windrush Millenium Centre, 70 Alexandra Road, Manchester, Greater Manchester, M16 7WD

The Windrush Millenium Centre, Alexandra Road - Solar Panels is a solar farm project in North West. The applicant or operator on record is DVC Group Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Man…

Consented / Approved
Project stageConsented
  1. PlanningOct 2025 (completed)
  2. ConsentedDec 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-01-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

The Windrush Millenium Centre, Alexandra Road - Solar Panels is a solar farm project in North West. The applicant or operator on record is DVC Group Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Manchester, reference 144397/P14J/2025.

Site Schematic

SUBSTATION ? ha Β· MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDVC Group Limited
Owner / operatorDVC Group Limited
Year consented2025
LocationGround Floor, The Windrush Millenium Centre, 70 Alexandra Road, Manchester, Greater Manchester, M16 7WD
RegionNorth West
Coordinates53.4564249Β°N, 2.2534158Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-10-30
2025-12-02