π Project Overview
The Wave - Solar & Battery Development is a 2.97 MW solar farm project in South West. The applicant or operator on record is The Wave Group Limited. Planning permission has been granted as of October 2021 and it is awaiting construction. The determining authority is South Gloucestershire, reference P21/00356/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 3 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | The Wave Group Limited |
| Owner / operator | The Wave Group Limited |
| Year consented | 2021 |
| Location | Land West Of The Wave Main Road Easter Compton South, Bristol, Gloucestershire, BS35 5RE |
| Region | South West |
| Coordinates | 51.5408443Β°N, 2.6205069Β°W |