π Project Overview
The Tween Bridge Solar Farm is a 400 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is RWE. The scheme is currently in the planning system, submitted August 2025. The determining authority is The Planning Inspectorate - National Infrastructure, reference EN010148.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 400 MW |
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | RWE |
| Owner / operator | RWE |
| Location | Moor Owners Rd, Thorne, Doncaster, South Yorkshire, DN8 5RX |
| Region | Yorkshire and Humber |
| Coordinates | 53.6207382Β°N, 0.9366274Β°W |