Solar Farm

The Tween Bridge Solar Farm

Moor Owners Rd, Thorne, Doncaster, South Yorkshire, DN8 5RX

The Tween Bridge Solar Farm is a 800 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is RWE. The scheme is currently in the planning system, submitted August 2025. The determining authority is The Planning Inspectorate - National Infrastructure,…

In Planning
Project stageIn planning
  1. PlanningAug 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-10-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

800.000 MW
Registered Capacity

πŸ“‹ Project Overview

The Tween Bridge Solar Farm is a 800 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is RWE. The scheme is currently in the planning system, submitted August 2025. The determining authority is The Planning Inspectorate - National Infrastructure, reference EN010148.

Site Schematic

SUBSTATION ? ha Β· 800 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)800.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE
Owner / operatorRWE
LocationMoor Owners Rd, Thorne, Doncaster, South Yorkshire, DN8 5RX
RegionYorkshire and Humber
Coordinates53.6207382Β°N, 0.9366274Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID19574
Mounting Type for SolarGround
Solar Site Area (sqm)18310000

πŸ“… Project Timeline

2025-08-26