π Project Overview
The Swinton Estate, Swinton Road - Solar Panels is a 0.38 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is The Swinton Estate. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is North Yorkshire, reference 25/01962/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | The Swinton Estate |
| Owner / operator | The Swinton Estate |
| Year consented | 2025 |
| Location | The East Of The Swinton Estate, Located To The East Of Swinton Road And South Of Masham Golf Course., North Yorkshire, HG4 4NS |
| Region | Yorkshire and Humber |
| Coordinates | 54.217669Β°N, 1.666146Β°W |