The Samworth Church Academy, Sherwood Hall Road, Mansfield, Nottinghamshire, NG18 2DY
The Samworth Church Academy, Sherwood Hall Road - Solar Panels is a 0.32 MW solar farm project in East Midlands. The applicant or operator on record is eEnergy Group PLC. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining autβ¦
Consented / Approved
Project stageConsented
PlanningOct 2025 (completed)
ConsentedDec 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-01-22.
Registered planning capacity; not measured generation.
The Samworth Church Academy, Sherwood Hall Road - Solar Panels is a 0.32 MW solar farm project in East Midlands. The applicant or operator on record is eEnergy Group PLC. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Mansfield, reference 2025/0596/PNSRE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.320 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
eEnergy Group PLC
Owner / operator
eEnergy Group PLC
Year consented
2025
Location
The Samworth Church Academy, Sherwood Hall Road, Mansfield, Nottinghamshire, NG18 2DY