The Range Distribution Centre, Central Park Distribution Park, Central Avenue, Bristol, Gloucestershire, BS35 4EL
The Range Distribution Centre, Central Avenue - Solar Panels is a 0.95 MW solar farm project in South West. The applicant or operator on record is InRange Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is β¦
Consented / Approved
Project stageConsented
PlanningFeb 2024 (completed)
ConsentedApr 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-05-03.
Registered planning capacity; not measured generation.
The Range Distribution Centre, Central Avenue - Solar Panels is a 0.95 MW solar farm project in South West. The applicant or operator on record is InRange Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Gloucestershire, reference P24/00532/PNRE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.950 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
InRange Limited
Owner / operator
InRange Limited
Year consented
2024
Location
The Range Distribution Centre, Central Park Distribution Park, Central Avenue, Bristol, Gloucestershire, BS35 4EL