Solar Farm

The Range Distribution Centre, Central Avenue - Solar Panels

The Range Distribution Centre, Central Park Distribution Park, Central Avenue, Bristol, Gloucestershire, BS35 4EL

The Range Distribution Centre, Central Avenue - Solar Panels is a 0.95 MW solar farm project in South West. The applicant or operator on record is InRange Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is …

Consented / Approved
1 MW
Installed Capacity

πŸ“‹ Project Overview

The Range Distribution Centre, Central Avenue - Solar Panels is a 0.95 MW solar farm project in South West. The applicant or operator on record is InRange Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Gloucestershire, reference P24/00532/PNRE.

Site Schematic

SUBSTATION ? ha Β· 0.95 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperInRange Limited
Owner / operatorInRange Limited
Year consented2024
LocationThe Range Distribution Centre, Central Park Distribution Park, Central Avenue, Bristol, Gloucestershire, BS35 4EL
RegionSouth West
Coordinates51.5348625Β°N, 2.6508173Β°W

πŸ“… Project Timeline