π Project Overview
The Range Distribution Centre, Central Avenue - Solar Panels is a 0.95 MW solar farm project in South West. The applicant or operator on record is InRange Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Gloucestershire, reference P24/00532/PNRE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | InRange Limited |
| Owner / operator | InRange Limited |
| Year consented | 2024 |
| Location | The Range Distribution Centre, Central Park Distribution Park, Central Avenue, Bristol, Gloucestershire, BS35 4EL |
| Region | South West |
| Coordinates | 51.5348625Β°N, 2.6508173Β°W |