Jimmy Gs, The Promenade, Leysdown, Sheerness, Kent, ME12 4QB
The Promenade, Leysdown - Solar Panels is a 0.17 MW solar farm project in South East. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining authority is Swale, refereβ¦
Consented / Approved
Project stageConsented
PlanningNov 2022 (completed)
ConsentedJan 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-01-17.
Registered planning capacity; not measured generation.
The Promenade, Leysdown - Solar Panels is a 0.17 MW solar farm project in South East. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining authority is Swale, reference 22/505373/PNJ.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.170 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
BeBa Energy UK Limited
Owner / operator
BeBa Energy UK Limited
Year consented
2023
Location
Jimmy Gs, The Promenade, Leysdown, Sheerness, Kent, ME12 4QB