The Promenade, Leysdown - Solar Panels is a 0.17 MW solar farm project in South East. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining authority is Swale, refere…

Consented / Approved
Project stageConsented
  1. PlanningNov 2022 (completed)
  2. ConsentedJan 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-01-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.170 MW
Registered Capacity

πŸ“‹ Project Overview

The Promenade, Leysdown - Solar Panels is a 0.17 MW solar farm project in South East. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of January 2023 and it is awaiting construction. The determining authority is Swale, reference 22/505373/PNJ.

Site Schematic

SUBSTATION ? ha Β· 0.17 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.170 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBeBa Energy UK Limited
Owner / operatorBeBa Energy UK Limited
Year consented2023
LocationJimmy Gs, The Promenade, Leysdown, Sheerness, Kent, ME12 4QB
RegionSouth East
Coordinates51.3993786Β°N, 0.9229283Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-11-17