πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility

200 Metres To The W/O The Portgordon Maltings, Buckie, Aberdeenshire, AB56 2BU

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility is a 4 MW bioenergy / waste project in Scotland. The applicant or operator on record is Grissan Engineering Services Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The d…

Consented / Approved
Project stageConsented
  1. PlanningJun 2023 (completed)
  2. ConsentedMar 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-03-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.000 MW
Registered Capacity

πŸ“‹ Project Overview

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility is a 4 MW bioenergy / waste project in Scotland. The applicant or operator on record is Grissan Engineering Services Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Moray, reference 23/00892/APP.

πŸ”§ Technical Specifications

Capacity (MW)4.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGrissan Engineering Services Limited
Owner / operatorGrissan Engineering Services Limited
Year consented2024
Location200 Metres To The W/O The Portgordon Maltings, Buckie, Aberdeenshire, AB56 2BU
RegionScotland
Coordinates57.6559149Β°N, 3.027677Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2023-06-06
2024-03-13