πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Renewable Energy

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility

200 Metres To The W/O The Portgordon Maltings, Buckie, Aberdeenshire, AB56 2BU

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility is a 4 MW renewable energy project in Scotland. The applicant or operator on record is Grissan Engineering Services Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The de…

Consented / Approved
4 MW
Installed Capacity

πŸ“‹ Project Overview

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility is a 4 MW renewable energy project in Scotland. The applicant or operator on record is Grissan Engineering Services Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Moray, reference 23/00892/APP.

πŸ”§ Technical Specifications

Capacity (MW)4 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGrissan Engineering Services Limited
Owner / operatorGrissan Engineering Services Limited
Year consented2024
Location200 Metres To The W/O The Portgordon Maltings, Buckie, Aberdeenshire, AB56 2BU
RegionScotland
Coordinates57.6559149Β°N, 3.027677Β°W

πŸ“… Project Timeline