The Paddock Centre Broadmoor Hospital Joshua Jebb Way, Berkshire, RG45 7ET
The Paddock Centre, Joshua Jebb Way - Solar Panels is a 0.19 MW solar farm project in South East. The applicant or operator on record is West London NHS Trust. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Brβ¦
Consented / Approved
Project stageConsented
PlanningDec 2024 (completed)
ConsentedJan 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-02-10.
Registered planning capacity; not measured generation.
The Paddock Centre, Joshua Jebb Way - Solar Panels is a 0.19 MW solar farm project in South East. The applicant or operator on record is West London NHS Trust. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Bracknell Forest, reference 24/00795/PAS.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.190 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
West London NHS Trust
Owner / operator
West London NHS Trust
Year consented
2025
Location
The Paddock Centre Broadmoor Hospital Joshua Jebb Way, Berkshire, RG45 7ET