The Old Airfield Site Eaton Upon Tern Market Drayton, Shropshire, TF9 2BX
The Old Airfield - Solar Farm is a 49 MW solar farm project in West Midlands. The applicant or operator on record is Peridot Solar Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Shropshire, reference 22β¦
Consented / Approved
Project stageConsented
PlanningMay 2022 (completed)
ConsentedMar 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-06-30.
Registered planning capacity; not measured generation.
The Old Airfield - Solar Farm is a 49 MW solar farm project in West Midlands. The applicant or operator on record is Peridot Solar Limited. Planning permission has been granted as of March 2023 and it is awaiting construction. The determining authority is Shropshire, reference 22/01866/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Peridot Solar Limited
Owner / operator
Peridot Solar Limited
Year consented
2023
Location