The Nuneaton Academy, Radnor Drive, Nuneaton, Warwickshire, CV10 7NR
The Nuneaton Academy, Radnor Drive - Solar Panels is a 0.46 MW solar farm project in West Midlands. The applicant or operator on record is Solar Options for Schools Limited. The scheme is currently in the planning system, submitted March 2026. The determining authority is Nuneatoβ¦
In Planning
Project stageIn planning
PlanningMar 2026 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2026-05-14.
Registered planning capacity; not measured generation.
The Nuneaton Academy, Radnor Drive - Solar Panels is a 0.46 MW solar farm project in West Midlands. The applicant or operator on record is Solar Options for Schools Limited. The scheme is currently in the planning system, submitted March 2026. The determining authority is Nuneaton and Bedworth, reference 41598.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.460 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Solar Options for Schools Limited
Owner / operator
Solar Options for Schools Limited
Location
The Nuneaton Academy, Radnor Drive, Nuneaton, Warwickshire, CV10 7NR