πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

The Hut Group, Skyline Drive - Solar Photovoltaic Panels

The Hut Group, The Hut Group Skyline Drive, Warrington, Cheshire, WA5 3TP

The Hut Group, Skyline Drive - Solar Photovoltaic Panels is a 1.5 MW solar farm project in North West. The applicant or operator on record is London Metric Property Plc. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining auth…

Consented / Approved
Project stageConsented
  1. PlanningSep 2025 (completed)
  2. ConsentedNov 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-12-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.500 MW
Registered Capacity

πŸ“‹ Project Overview

The Hut Group, Skyline Drive - Solar Photovoltaic Panels is a 1.5 MW solar farm project in North West. The applicant or operator on record is London Metric Property Plc. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Warrington, reference 2025/01376/PA14J.

Site Schematic

SUBSTATION ? ha Β· 1.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLondon Metric Property Plc
Owner / operatorLondon Metric Property Plc
Year consented2025
LocationThe Hut Group, The Hut Group Skyline Drive, Warrington, Cheshire, WA5 3TP
RegionNorth West
Coordinates53.4119517Β°N, 2.6595077Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (Old REPD Ref) 19416

πŸ“… Project Timeline

2025-09-30
2025-11-13