Bioenergy / Waste

The Ffaldau Waste Re Cycling Centre, Llandegley - CHP

The Ffaldau Waste Re-Cycling Centre Llandegley Llandrindod Wells, Powys, LD1 5UD

The Ffaldau Waste Re Cycling Centre, Llandegley - CHP is a 2.5 MW bioenergy / waste project in Wales. The applicant or operator on record is Powys Environmental Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining author…

Consented / Approved
Project stageConsented
  1. PlanningOct 2023 (completed)
  2. ConsentedMar 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.500 MW
Registered Capacity

πŸ“‹ Project Overview

The Ffaldau Waste Re Cycling Centre, Llandegley - CHP is a 2.5 MW bioenergy / waste project in Wales. The applicant or operator on record is Powys Environmental Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Powys, reference 23/1484/FUL.

πŸ”§ Technical Specifications

Capacity (MW)2.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPowys Environmental Limited
Owner / operatorPowys Environmental Limited
Year consented2025
LocationThe Ffaldau Waste Re-Cycling Centre Llandegley Llandrindod Wells, Powys, LD1 5UD
RegionWales
Coordinates52.2561341Β°N, 3.2733467Β°W

Additional published register fields

Registered technologyEfW Incineration
Are they re-applying (Old REPD Ref) 12527

πŸ“… Project Timeline

2023-10-09
2025-03-10