The Electricity Substation, Baslow Road - Energy Storage System is a 0.2 MW battery storage project in East Midlands. The applicant or operator on record is AMP Clean Energy. The planning application was refused. The determining authority is North East Derbyshire, reference 25/00β¦
Refused
Project stageRefused
PlanningAug 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-12-09.
Registered planning capacity; not measured generation.
The Electricity Substation, Baslow Road - Energy Storage System is a 0.2 MW battery storage project in East Midlands. The applicant or operator on record is AMP Clean Energy. The planning application was refused. The determining authority is North East Derbyshire, reference 25/00649/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.